Route capacity

How Many Bins Can You Clean Per Hour?

Estimate bin-cleaning throughput from the full stop cycle: arrival, handling, washing, finishing, travel, refills, and disposal.

Reviewed November 6, 20267 min readOperations
Planning guidance

Confirm equipment specifications, local requirements, and financial assumptions for your operation. This page is educational and is not legal, tax, or financial advice.

Decision snapshot

Time at least a representative route block, not a demonstration cycle. The useful number is completed, billable bins per paid labor hour under normal route conditions.

Start clock
Arrival at one stop
Stop clock
Arrival at the next stop
Include
Handling, exterior work, pack-down, travel, refill, and disposal
Report
A range with stated crew, route, and bin conditions

The wash cycle is not the route cycle

Quoted cleaning-cycle time can exclude parking, hose handling, loading, unloading, exterior work, customer exceptions, travel, refills, and wastewater disposal. Measure from arrival at one stop to arrival at the next.

  • Bins at the stop
  • Handling and wash time
  • Exterior rinse and finishing
  • Pack-up and travel
  • Refill and disposal allocation

Use a measured formula

Average minutes per stop should include a share of refill, disposal, and nonproductive route time. Stops per hour equal 60 divided by average minutes per stop. Bins per hour equal stops per hour multiplied by average bins per stop.

  • 60 ÷ average minutes per stop = stops per hour
  • Stops per hour × average bins per stop = bins per hour
  • Use a range, not a single best run

Compare systems under the same test

A one-bay and two-bay system should be compared with the same operator count, bin condition, route pattern, water plan, and definition of completion. Kraken should publish first-party timed tests as they become available.

Questions to resolve before committing

Write down the answer, the source, and what still needs confirmation. Unknowns should remain visible in the purchase or operating plan.

  1. How many bins are normally available at each stop?
  2. What percentage of stops require extra handling or cannot be completed?
  3. How often does the operator refill, discharge, clear debris, or reposition the vehicle?
  4. Does adding a second bay remove the actual bottleneck or simply add idle hardware?