Confirm equipment specifications, local requirements, and financial assumptions for your operation. This page is educational and is not legal, tax, or financial advice.
Decision snapshot
Normalize competing quotes into one delivered-system worksheet. Mark every line as included, optional, buyer-supplied, or unknown; an unknown item is not a zero-dollar item.
- Do not compare
- A core cleaner directly with a complete road-ready platform
- Price drivers
- Platform, bays, heat, tanks, integration, and options
- Delivered cost
- Equipment + options + freight + tax + buyer-supplied work
- Quote control
- The written configuration and final price
Start with the configuration
A core cleaning assembly and a complete road-ready system are not equivalent quotes. Confirm what the listed price includes before comparing manufacturers.
- Cleaning assembly only or complete platform
- One bay or two
- Hot water or cold water
- Fresh- and wastewater tanks
- Trailer, truck pod, flatbed, or stationary mount
Compare the delivered operating system
Freight, tax, vehicle requirements, accessories, installation, training, warranty, and support can change the effective acquisition cost.
- Final delivered price
- Required buyer-supplied equipment
- Lead time and shipping
- Warranty scope
- Maintenance and parts access
Kraken's published starting points
Kraken currently lists core systems from $9,999 and complete mobile configurations at higher starting prices. Product pages show the current base price and visible configuration details. A written quote controls final specifications and pricing.
- Compare current Kraken systems
- Request a configuration-specific quote
- Discuss financing after the equipment is selected
Questions to resolve before committing
Write down the answer, the source, and what still needs confirmation. Unknowns should remain visible in the purchase or operating plan.
- Does the quote include the trailer, tanks, heat, recovery, controls, hoses, reels, and title?
- Which vehicle, mounting, electrical, plumbing, or fabrication tasks remain?
- What warranty applies to the system and to individual components?
- How quickly can routine wear parts be sourced?
